Governance frameworks say what an organization has to manage. They do not say which test to write. That gap is where most AI governance programs stall: the policy is approved, the risks are listed, and the system keeps changing without anyone being able to show that the rules still hold. This guide reads two common references, the NIST AI Risk Management Framework and ISO/IEC 42001, from the engineering side, and names the controls and the evidence a team can produce for each part.
The NIST AI RMF, function by function
The framework (NIST AI 100-1, version 1.0) organizes the work in four functions. NIST calls it a living document, and a companion profile for generative AI, NIST AI 600-1, was published in July 2024. Read the current version before you map to it.
- Govern. Roles, policies and accountability across the life of a system. Engineering evidence: an inventory of the AI systems in production, an owner for each one, and a written rule for who approves each kind of change, enforced by the repository and the pipeline rather than by memory.
- Map. The context of a system: what it is for, who it affects, which data and tools it can reach and what could go wrong. Engineering evidence: a short system card per system, kept in the repository, that lists its purpose, its tools and permissions, its data sources and the actions it must never take.
- Measure. Assessing the risks that were mapped. Engineering evidence: evaluation cases written with the people who know the domain, checks in code for what is exact, a judge calibrated against human labels for the rest, and the results of every run kept with the version that produced them.
- Manage. Acting on what was measured. Engineering evidence: a gate that blocks a release that fails, permissions enforced outside the model, human approval before actions that cannot be undone, monitoring in production, and a rollback path that has been tested.
The order matters less than the connection. A risk that is mapped but never measured is a wish. A measurement that does not stop a release is a report.
ISO/IEC 42001 from the engineering side
ISO/IEC 42001, published in December 2023, specifies an AI management system: a way for an organization to set objectives for its AI, plan for its risks, operate controls and improve them. Its Annex A lists reference controls, and an organization records which ones apply and why in a Statement of Applicability.
Engineering does not write the management system, and it supplies most of the evidence that it works. For the controls about the life cycle of AI systems, their data, their documentation and their monitoring, an auditor will ask to see something concrete: the test that ran before a release, the record of who approved a change, the log of what a system did. The controls below are built to leave exactly that.
The controls, and the evidence each one leaves
- Evaluation gate. Cases versioned next to the code, run on every change, with a rule in the pipeline that blocks a failure. Evidence: the results of each run, tied to the commit that produced them.
- Change control for prompts and models. Prompts, tools and configuration versioned and reviewed like code, and released only through the gate. Evidence: the history of each change, its review and its evaluation result.
- Permission limits. Scoped credentials, read-only access where reading is enough, and allowed actions enforced by the infrastructure, not by instructions in a prompt. Evidence: the policy files and the denials they produced.
- Human approval. A person confirms any action that cannot be undone, such as sending, paying or deleting. Evidence: the approval record, with who approved and what they saw.
- Audit trail. A record of each run and each tool call: actor, authorization, version, inputs referenced, outcome. With rules on redaction, access and retention. Evidence: the trail itself, and a test that shows it is complete.
- Incident review. Each failure in production becomes a new evaluation case, so the gate keeps it from coming back. Evidence: the incident record and the case it added.
Where the EU AI Act fits
The EU AI Act, Regulation (EU) 2024/1689, sets obligations by the risk level of a system and by the role of the company, with dates that apply in stages. The dates for high-risk systems were the subject of the Digital Omnibus that the European Commission proposed in November 2025, so check the current text on EUR-Lex before planning against a date. Whether a system is high-risk is a legal reading. What engineering can do is make sure that, if it is, the logging, the human oversight and the documented testing already exist.
Start with one system
- Choose the system with the most at stake.
- Write its system card: purpose, tools, data, forbidden actions, owner.
- Build the audit trail and ten evaluation cases, and connect the gate.
- Move its permissions out of the prompt and into the infrastructure.
- Show the evidence to the people who own risk and compliance, and ask what is missing.
A control that works on one system teaches more than a policy that covers every system on paper.
How my work fits
I build these controls as a Senior AI Engineer, remotely from Monterrey, Mexico. My published work covers the same ground: research on accountability and justifiability in agentic software engineering, an evaluation harness with 138 golden cases for a production multi-agent system, and open-source MCP servers with scoped access to data. I do not give legal opinions or certify; I build and test the technical side and document it for the people who do.
Sources
- NIST, Artificial Intelligence Risk Management Framework (AI RMF 1.0), NIST AI 100-1
- NIST, Generative Artificial Intelligence Profile, NIST AI 600-1
- ISO, ISO/IEC 42001:2023, AI management system
- European Union, Regulation (EU) 2024/1689, the AI Act, on EUR-Lex
Where to go next
- AI governance for engineering teams: the controls built in your system
- What is AI governance?
- Agent auditability: what to record about each action
- Automated LLM evaluation: the evaluation behind the gate
- Agentic workflow integrity: proving the tested system is the deployed one
- Contact