# Work cut, <window>

Here is the cut for <window>, block by block, with what got done and what is still ahead of us.

## 1. Merges and reviews
- What landed, by repository, with who reviewed it.
- What is open and what it is waiting for (a vote, a fix, a decision), with the owner.
- One stumble and its correction, if there was one. Say it before someone else does.

## 2. Tickets
- Closed with verification, by person. Created because of a real problem, by person. Created for organization.
- State of the sprint: what is active, what expired, what is proposed.

## 3. <Product line A>
- What entered trunk (rule, fix, tool) with its ticket.
- Current tag; what reached each environment; whether the release decision is pending.
- State of the test campaign: last verdict date, scenarios never run.

## 4. <Product line B>
- Same shape as block 3. Include what is structurally missing (a prompt that is still a copy, a matrix not loaded), not only what moved.

## 5. Services and contracts
- Sign-offs given, precisions requested, defects found in live behaviour.

## 6. Internal tooling
- What the team builds for itself, as tickets with owners.

## 7. What we are asking
- <Person>: <one concrete action>, by <date if any>.
- <Person>: <one concrete action>.
- Me: <what I will do next>.

Every figure above was measured in the source systems on the day of the cut. No internal tool names, no local paths.